Steel frame & truss installation · Carpentry · South East Queensland
Home / Services
Services

Steel frame, truss & carpentry installation

From the first bottom plate to the last piece of fascia. Every service below is delivered by our own crews, to the engineer's design and the manufacturer's installation manual.

Steel frame installation

Wall frames, stood right the first time

Light-gauge steel wall frames arrive pre-fabricated and labelled. Our job is everything that happens after the truck leaves: setting out on the slab, standing and plumbing panels, connecting to the engineer's tie-down schedule, and installing bracing so the frame passes inspection and gives every following trade a straight surface to work from.

  • Single and double-storey residential steel frames
  • Set-out, bottom-plate fixing and hold-down bolts / anchors to engineering
  • Strap, sheet and K-bracing installed to the bracing plan
  • Lintels, load-bearing beams and portal frames
  • Noggings, service penetrations and plaster backing as detailed
  • Installed to the NASH Standard for residential steel framing and the fabricator's manual
Photo: crew standing steel wall frames
Photo: roof trusses being craned into position
Roof truss installation

Steel and timber roof trusses

A roof is where set-out errors show up and where wind loads matter most. We install steel and timber truss systems with the bracing, tie-downs and connections the engineer specified — including the fiddly bits: hips, valleys, girder trusses, cantilevers, raked ceilings and dutch gables.

  • Standard, hip, girder, scissor and raked-ceiling trusses
  • Temporary and permanent bracing to the truss layout and AS 4440 / manufacturer's guide
  • Cyclone and high-wind tie-down for N1–C3 wind classifications
  • Roof battens, fascia, barge and eaves framing
  • Crane coordination and safe-work-at-heights systems
  • Truss repairs and modifications to engineer's rectification details
Floor systems & decks

Sub-floors, upper floors and decks

Sloping blocks and second storeys need a floor system that's level, stiff and quiet underfoot. We install steel bearer-and-joist systems, upper-floor joist cassettes and structural framing for decks and balconies — and we'll fit the flooring sheets if you want the floor closed in before the frame goes up.

  • Steel sub-floor systems on posts, stumps or piers
  • Upper-floor joists, cassettes and rim boards
  • Structural flooring (particleboard, ply, compressed fibre cement) installed and glued
  • Deck, balcony and verandah framing in steel or timber
  • Stair stringers and landing framing
Photo: steel bearers and joists on a sloping block
Photo: carpenter fixing fascia and eaves
Carpentry & fix-out

Qualified carpenters, not just installers

Our crews are trade-qualified carpenters. That means we can carry a job through lock-up and, where you need it, fix-out — and we can handle the timber elements that steel jobs still have.

  • Lock-up carpentry: windows, external doors, fascia, eaves and soffits
  • Fix-out carpentry: internal doors, architraves, skirting, shelving
  • Timber framing for renovations, extensions and raise-and-builds
  • Pergolas, patios and carports
  • Rectification and insurance repair framing
Light commercial

Small commercial, done to a programme

Light commercial work needs the same accuracy as residential with more paperwork and tighter sequencing. We're set up for it: SWMS, site inductions, white cards, working-at-heights and EWP tickets, and crews sized to hit milestone dates.

  • Childcare centres, medical and dental suites, small offices
  • Retail and hospitality shells and internal steel stud partitions
  • Sheds, workshops and small industrial units
  • Multi-unit and townhouse framing packages
  • Fire-rated and acoustic wall framing to the specified systems
Builder information
Photo: light commercial steel frame — childcare centre
Common questions

Frame & truss install FAQ

Do you supply the frames and trusses, or install only?
We are primarily an installation contractor: you (or your builder) order the frame and truss package from your preferred fabricator and we install it. We're happy to recommend fabricators we work well with, review layouts before they go to production, and coordinate delivery to suit the stand.
How long does a frame and truss stand take?
A typical single-storey home is usually framed and roofed in a matter of days once the slab is cured and the package is on site. Double-storey and complex roofs take longer. We'll give you a realistic duration in the quote, based on your plans, not a generic figure.
What do you need from us before you start?
Current architectural drawings, structural engineering including the tie-down and bracing schedule, the fabricator's frame and truss layouts, a cured slab with set-out confirmed, site access for a crane or forklift where required, and power/water on site.
Are you licensed and insured?
Yes. SuperStructure Installs holds a QBCC licence (no. 15071771), public liability insurance and workers' compensation cover. Certificates of currency are available on request.
Do you work with owner-builders?
We do, subject to availability. Owner-builders should hold a valid QBCC owner-builder permit for the work. We'll walk you through what needs to be ready before the crew arrives.
Which areas do you cover?
Greater Brisbane, Gold Coast, Sunshine Coast, Ipswich, Logan, Moreton Bay, Redlands and the Scenic Rim, with Toowoomba and the Lockyer Valley by arrangement. See our service areas page.

Ready to price your next frame?

Send through your plans and engineering — we'll come back with a clear, itemised quote and realistic install dates.

Call now Get a quote